New Ohio bridge could cost up to $233 million

01/11/2009 | Plain Dealer (Cleveland), The

Building a new eight-lane Inner Belt Bridge in Ohio would take about two years and cost up to $233 million depending on materials used, according to a report by a consulting group. The state has secured most of the funding needed to build the bridge, which will likely be constructed of steel girders or basic concrete.

View Full Article in:

Plain Dealer (Cleveland), The

Published in Brief: