Workers begin work on safety measures at PortMiami tunnel

01/31/2013 | WPLG-TV (Miami)

Crews have started work on safety measures at the PortMiami tunnel, as they apply fire-resistant coating to all the concrete from the pavement, up the walls to the ceiling. Jet fans have been installed and can reverse the air flow in an emergency. A pedestrian walkway is being built, and five cross passages are being excavated for emergency evacuations. The project is expected to be finished in May 2014.

View Full Article in:

WPLG-TV (Miami)

Published in Briefs: