Time-lapse video shows "slide" work on Ohio River bridge segment

03/17/2014 | WLKY-TV (Louisville, Ky.) · WLWT-TV (Cincinnati)

A time-lapse video provides a look at the "slide" work done on a nearly 100-foot concrete segment of the new Milton-Madison Bridge over the Ohio River between Milton, Ky., and Madison, Ind. The concrete segment slide will be followed by the slide of a nearly half-mile-long steel truss section of the bridge that is expected to take place this month. ​

View Full Article in:

WLKY-TV (Louisville, Ky.) · WLWT-TV (Cincinnati)

Published in Brief: