Independent review backs Hansom Dam plan by Army Corps

03/31/2010 | Seattle Times, The

An independent study agreed with the Army Corps of Engineers' vision for the Hanson Dam on the Green River in Washington. The Corps plans to shore up a reservoir wall at the dam after heavy rains weakened an abutment in 2009. The independent review by Battelle Memorial Institute engineers also concurs with a Corps' plan to build a deep concrete wall along the length of the abutment.

View Full Article in:

Seattle Times, The

Published in Brief: