I-95 beam installation goes smoothly

08/25/2003 | Washington Post (tiered subscription model), The

While dozens of area residents watched, Virginia's Department of Transportation successfully installed three huge steel beams, which are the size of a football field, on a new bridge that overhangs I-95's Springfield Mixing Bowl. I-95's northbound lanes were closed for the installation and additional closures will be needed to complete the project.

View Full Article in:

Washington Post (tiered subscription model), The

Published in Brief: