Port Authority shows how to fast-track raising of Bayonne Bridge

08/28/2012 | Star-Ledger (Newark, N.J.), The

The Port Authority of New York and New Jersey will be doing the design work for the Bayonne Bridge project in-house in an effort to save time. The authority decided to do the design in-house while the environmental study was in process rather than waiting for that to end and bid out the job. The agency said it will also use time-saving techniques in the construction plan that it calls "an engineering marvel."

View Full Article in:

Star-Ledger (Newark, N.J.), The

Published in Briefs: