5/26/2004

A $200 million sewage pumping and transport system that will help reduce backup and surcharge problems for six Boston communities is making use of three different tunneling technologies. The tunnels must cross a river, a peninsula and a bay; the tunnel that transverses the Boston Harbor is 2.7 miles long and 42 inches in diameter.

Related Summaries