7/24/2006

The opening of a key ramp connecting South Boston to Logan International Airport through the Ted Williams Tunnel has been delayed as repairs are made to bolts that attach concrete panels to the tunnel's ceiling. Extra precautions are being taken in the aftermath of the July 10 ceiling collapse in another Boston tunnel that caused the death of a car's passenger.

Related Summaries