5/22/2007

A critical portion of Boston's Storrow Drive is deteriorating, and the options for repairing the heavily traveled roadway could take two to four years. The artery's eastbound tunnel has deteriorating concrete sections and corroded steel members, and there is beam corrosion on the roof of the tunnel.

Related Summaries