1/12/2009

Building a new eight-lane Inner Belt Bridge in Ohio would take about two years and cost up to $233 million depending on materials used, according to a report by a consulting group. The state has secured most of the funding needed to build the bridge, which will likely be constructed of steel girders or basic concrete.

Related Summaries