2/2/2009

Plunking a 25-story building with an elliptical floor plan onto a rectangular eight-story parking garage supported by cast-in-place post-tensioned slabs posed challenges for both design and construction teams. Design engineers transferred support for the building to different columns via a concrete mat that used 500 tons of steel, and contractors found innovative solutions for pouring the mat.

Full Story:
STRUCTURE magazine

Related Summaries