2/3/2009

Structural engineers working on the Vancouver Convention Centre used building information modeling to design the project in 3D. BIM allowed engineers to estimate the amount of steel needed within 5% of the final built configuration. The 1.4-million-square-foot building was constructed over a marine deck and includes environmental features such as a green roof.

Full Story:
STRUCTURE magazine

Related Summaries