1/6/2010

Even as Boeing Co. ramps up testing on its 787 Dreamliner, the company is working to smooth out the production issues that arise when testing results force design changes. With a worldwide supplier base shipping components to Washington for final assembly, Boeing hopes to avoid last-minute retrofits that delay production and lead to wrangling over how the costs should be shared.

Related Summaries