1/26/2010

A plan to move Burlington Northern Santa Fe tracks outside central Fresno, Calif., would cost at least $803 million -- an estimate high enough to cause the coalition pushing the move to abandon its efforts. The original idea was to align BNSF tracks along the Union Pacific corridor, streamlining the railways.

Related Summaries