4/14/2011

TAI workers used drills and a splitting cylinder and combi shear to remove reinforced concrete structures from the bottom of a 26-foot-deep tank filled with water. The crew's challenge was to remove the structures without damaging the tank or other structures. A truck crane was used to lift the sections to dry ground.

Related Summaries