8/20/2013

Skanska evaluated conditions below the site of the University of North Carolina Hospital’s Hillsborough Campus project to map out building conditions on the rocky turf. A contractor performed some borings and added data to CAD drawings, which were used to create a 3D model. The model would be a clash between the rocks and some of the proposed utility routes. That finding saved the project $300,000, according to this article.

Related Summaries