9/26/2013

The $9.4 million rehabilitation of the Stillwater Viaduct over the Woonasquatucket River in Smithfield, R.I., has been named "Best Rehabilitated Bridge" in North America by the Precast/Prestressed Concrete Institute. The project's use of precast allowed the design team to preserve the 449-foot span's architectural details, save $110,000 on construction costs and shorten work to seven months instead of three years.

Related Summaries