1/31/2014
GOSPHOTODESIGN/ GOSPHOTODESIGN

The control room on a subway line in London was accidentally flooded with fast-setting concrete, a situation that brought the line to a standstill. Engineers, using sugar to counter the fast-setting process, worked through the night to remedy the "blunder" and get things working again.

Related Summaries