4/18/2014

Minnesota Power has formally filed for permits to allow the utility to build a 220-mile transmission line through northern Minnesota to a planned hydroelectric dam in Manitoba, Canada. Two routes have been proposed for the Great Northern high-voltage electric transmission line. Depending on which route is chosen, the project could cost up to $650 million.

Related Summaries