Skip to main content
Accelerated construction used for Wash. airport pedestrian walkway
2/10/2020

Crews are using accelerated bridge construction to build a 780-foot-long pedestrian walkway connecting Seattle Tacoma International Airport's new International Arrivals Hall with the airport's South Satellite. The aerial walkway features a cable-stayed design and 17 prefabricated components.

Full Story: