Skip to main content
Work underway to quickly repair Bonneville Dam lock
9/20/2019

Crews are working on emergency repairs to a navigation lock at Bonneville Lock & Dam with the goal of reopening it by the end of the month. Workers are overhauling the lock's cracked concrete sill after inspections showed water was able to penetrate underneath it because of failed sealant between it and the lock floor.

Full Story: